Parking Lot Paving

What We Handle

Complete Parking Lot Paving Services

From new construction to full-depth replacement, we coordinate the details that matter on commercial sites—access, staging, and a finished surface that holds up to daily use.

New Parking Lot Installation

Grading, base prep, and asphalt installation for new builds and expansions—designed for your traffic patterns and site layout.


Parking Lot Replacement

Remove and replace failing asphalt, correct base issues, and rebuild for a clean, durable surface with improved drainage and ride quality.


Resurfacing & Overlays

When the base is sound, an overlay can restore appearance and performance while extending service life at a lower cost than full replacement.


Striping Coordination & Final Details

We plan for striping, ADA-accessible areas, and clean edges so your lot is ready for use as soon as the job is complete.

Built The Right Way

A Better Lot Starts With The Base, The Mix, And The Finish

Commercial paving is more than a smooth top layer. We focus on compaction, drainage, and clean transitions so your lot performs through Michigan freeze/thaw cycles.

Drainage & Slope Planning

We evaluate water flow and pitch so runoff moves where it should—reducing standing water and premature surface breakdown.

Proper Base Prep & Compaction

Stable subgrade and a well-compacted base help prevent rutting, cracking, and settlement under heavy traffic.

Trusted By Property Managers And Owners

Clear communication, reliable scheduling, and a finished lot that looks great and lasts.

★★★★★

“They kept our tenants informed, worked efficiently, and delivered a smooth lot that drains properly.”

Hand holding an asphalt core sample for road testing

Commercial Property Manager

Retail Center

★★★★★

“The crew was professional and the finished surface looks excellent. Striping went back down without delays.”

Orange traffic cone marking new asphalt road construction

Facilities Director

Industrial Site

★★★★★

“Fast turnaround on a replacement section and the transitions are clean. We’ll be using them again.”

Road construction workers operating heavy machinery removing damaged asphalt surface from city street

Operations Manager

Office Complex

Parking Lot Paving FAQs

Quick answers to common questions for commercial paving projects in Auburn Hills and surrounding counties.

How do I know if my lot needs resurfacing or full replacement?

If the base is stable and issues are mostly surface-level (oxidation, minor cracking), resurfacing may work. Widespread alligator cracking, pumping, or settlement often points to base failure and replacement.

Can you phase the work to keep my business open?

Yes. We can plan the project in sections to maintain access, coordinate staging, and reduce disruption for customers and tenants.

Do you handle drainage problems and low spots?

We address grading and slope as part of the plan. Correcting drainage helps prevent standing water, ice, and premature asphalt deterioration.

How long before vehicles can drive on new asphalt?

Light traffic is often possible within 24–48 hours depending on conditions. Heavier traffic and tight turns may require additional cure time—your estimate will include guidance.

Do you coordinate striping and ADA-accessible markings?

We plan for striping, ADA-accessible stalls, and clean edges so the lot is ready for final markings after paving and cure time.

What areas do you serve?

We’re based in Auburn Hills, MI and serve Oakland County plus Macomb, Livingston, Lapeer, and Wayne counties.

Minimize Downtime for Your Business

We plan around peak hours and can phase work to keep access open for businesses across Oakland and Macomb County.